UK
A modern cast-concrete house in a pine forest
ArchitectureConstruction2011—2026

WE BUILD SPACE. NOT SQUARE METRES.

From the first line to the last joint.
One team. One point of responsibility.

View projects
/00Position

We bring architectural thinking and construction discipline together.

We don't bend chaos to fit pretty renderings. First we build the logic of the project — structure, cost plan, schedule, materials. Only then do we break ground.

  • 01Budget fixed before we start
  • 02Weekly report from site
  • 035-year warranty on workmanship
/01Selected projects

Three projects.
Three different contexts.

01/03

Private house

PINE HOUSE

Area
286 m²
Year
2025
Location
Kozyn

Reconstruction

PODIL 1931

Area
412 m²
Year
2024
Location
Kyiv

Commercial space

VARTA WINE

Area
198 m²
Year
2025
Location
Lviv
Pine House — a concrete house in a pine forest
01PINE HOUSE / KOZYN
Podil 1931 — a restored brick building with a contemporary extension
02PODIL 1931 / KYIV
Varta Wine — a restaurant in a historic Lviv cellar
03VARTA WINE / LVIV
/02Services

We treat a building
as one complete system.

We take on architecture, engineering, cost planning, procurement and construction.

01

Private houses

Turnkey design and build: from ground surveys to furniture.

02

Reconstruction

Structural surveys, strengthening and a new life for buildings with a history.

03

Fit-out and interiors

Finishing works, building services, bespoke joinery and design supervision.

04

Commercial spaces

Offices, restaurants and retail, delivered to a fixed opening date.

/03In numbers

Trust should
be measurable.

Not by promises. By facts, a schedule and ownership of every decision.

15

years in construction

64

projects completed

91%

clients come by referral

5

years' warranty on workmanship

/04Approach

On site,
there's no “later”.

Every decision has to be made before it becomes expensive. That's why we put the architect, the structural engineer, the services engineer and the builder at one table.

How we work ↓
  1. 01

    One team

    No passing responsibility between contractors.

  2. 02

    Open cost plan

    You see the price, quantity and status of every line item.

  3. 03

    Design supervision

    The architect stays on the project until the keys are handed over.

/05Project path

From conversation
to keys in hand.

A typical private house takes 14—18 months.

  1. 01BRIEF

    The plot, how you live, the budget.

  2. 02DESIGN

    Architecture, structure, building services.

  3. 03ESTIMATE

    Exact quantities, prices and schedule.

  4. 04BUILD

    Construction with a weekly report.

  5. 05HANDOVER

    Commissioning, documentation, warranty.

Checking the precision of a junction between concrete, steel and timber
/06Materials / quality

Quality shows
in the details.

We never hide inaccuracy behind finishes. Every concealed stage is photographed and inspected by a technical supervisor.

  • 01Incoming materials inspection
  • 02Technical supervision at key stages
  • 03As-built documentation
  • 04Aftercare after handover
/07Reviews
01 / 03

Client reviews

“We came with a mood board and got a house that fits exactly the way we live. The budget only changed where we ourselves added something.”
Oleksii and MariiaPine House, Kozyn
/08Start a project

Estimate
your project..

Describe the job in a few words. We'll call you back within one business day.

By clicking the button, you agree to our privacy policy. Your details are used only to contact you about the project.

/09Contact

Let's start
by talking.

+38 044 390 48 12 ↗ studio@monolith-build.com.ua ↗
Studio

72 Velyka Vasylkivska St.
Kyiv 03150

Directions ↗
Hours

Mon—Fri / 09:00—18:00
Meetings by appointment

Coverage

Kyiv and Kyiv Oblast
Projects across Ukraine

Get an estimate

© NOVA. Demo website. Copying or use without a licence is prohibited